| Inspection Stages for quality: |
- Incoming inspection of material as per check sheets & drawings.
- Testing of material in reliability test lab, as per sampling plan
- Line Patrol inspection. (As per torque check sheet)
- Line final inspection. (As per line check sheet)
- Dynamometer testing
- Road testing
- Final inspection. (As per final I. check sheet)
- Pre-dispatch inspection. (As per PDI check sheet)
|
| Reliability Test: Lectrix e bike parts are tested in the lab for reliability test. The plant has state of the art reliability testing facilities like – |
- Plating Durability Test
- Paint Durability Test
- Powder Coating Durability Testing
- Tensile Strength Test
- Yield Strength
- Elongation Testing
- Flattening Test
- Drift Test
- Materials Hardness Testing
- Fatigue Life Testing.
|